Getzner has developed a special vibration protection measure to ensure passenger comfort and durability of the track in the world’s longest railway tunnel. Until the opening in June 2016, testing is in full swing.
The high speeds of the trains also exert strong pressure and suction forces, which put the material under above-average stress. Elastic Sylodyn bearings for the single block sleepers and high-speed turnouts have been installed in both tunnel tubes for the slab track and on sections of the approach routes. “The vibration protection measure reduces vibrations, and therefore wear of the superstructure components, minimising the maintenance required on the track,” explains Juergen Rainalter, Chief Executive Officer of Getzner. This project imposed very high demands on the railway technology in the Gotthard Base Tunnel, because all the materials have to deliver excellent performance over the entire planned service life of the tunnel.